
UB25 LINEAR DC RESISTANCE WELDING CONTROL
990-665
5-1
CHAPTER 5
SETUP SOFTWARE
Section I: Introduction
Overview
The Power Supply contains internal software that gives you a great deal of flexibility in the setup and use
of your welding system. The Power Supply software displays various menu screens on the LCD, each
containing prompts telling you which of the Power Supplies front panel controls to use in order to
customize operating parameters, set the Power Supply for use in an automated welding system, and
program communication settings for use with data-gathering devices such as a host computer.
This chapter is divided into the following sections:
How to Use Menu Screens
•
Main Menu
•
Setup Menus
Operator Preferences
•
Display Contrast
•
Buzzer Loudness
•
End Of Cycle Buzzer
•
Update Graph After Weld
•
Buzzer On Weld Stop
System Settings
•
Waveform Check
•
Footswitch Weld Abort
•
Switch Debounce Time
•
Firing Switch
•
Input Switch Select
•
Control Signals Select
•
Weld Counter Functions
•
System Security
•
Calibration
•
Chain Schedules
PID Test Weld Setup
•
Overview
•
Do Test Weld Options
•
Ignore First/Last
Relay Settings
•
Function
•
Programming Instructions
Special Functions
•
Copy A Schedule
•
Reset Defaults
−
Reset System Parameters
−
Reset All Schedules
Communication and Data
•
Requirements
•
Communication
•
I.D. Number
•
Baud Rate
Before programming the Power Supply, you must be familiar with the
location
and
function
of the LCD
and front panel controls. If you need more information, see
Chapter 1
of this manual.