![Amada UB25 Operation Manual Download Page 59](http://html1.mh-extra.com/html/amada/ub25/ub25_operation-manual_2915806059.webp)
CHAPTER 4: OPERATING INSTRUCTIONS
UB25 LINEAR DC RESISTANCE WELDING CONTROL
990-665
4-11
Section VI. Operation
General Operator Safety
ALWAYS
wear safety goggles and other appropriate safety equipment when you are
performing a
welding operation
.
Manual Welding
Operation
1
Verify that all components of your welding system have been properly connected and turned ON.
2
Verify that all welding components are operating properly and ready for use.
3
Verify that you have programmed the Power supply with all necessary schedules for your
welding application.
4
Set the
WELD/NO WELD
switch on the front panel to the
WELD
position.
5
Select the desired weld schedule and begin welding using normal operating procedures.
Normal STOP
When finished welding, turn the Power Supply OFF.
Automated Welding
Operation
1
Verify that all components of your welding system have been properly connected and turned ON.
2
Verify that all welding components are operating properly and ready for use.
3
Verify that you have programmed the Power Supply with all necessary schedules for your
welding application.
4
Verify that the Automation and Communication software has been properly programmed.
5
Perform all software Test and Setup procedures to verify that the PLC is communicating properly
with the Power Supply.
6
Set the
WELD/NO WELD
switch on the front panel to the
WELD
position.
7
Begin welding using normal automation operating procedures.