x530L Series Installation Guide for Virtual Chassis Stacking
147
8. If there is a third switch, power it on and wait another two minutes for it
to join the stack as a member with the ID number 3.
9. If there are additional switches, continue to power each one at a time
and wait two minutes for it to join the stack as a member with the next
ID number.
At this point, the stack is operational.
The ID numbers are automatically stored in special files in the flash
memories of the switches and are retained by the devices even if you
reset or power cycle the stack.
To continue with the installation, go to “Starting a Local Management
Session” on page 150 and “Verifying the Stack” on page 153.
Summary of Contents for x530L Series
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 56: ...Chapter 1 Overview 56 ...
Page 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Page 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Page 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...