3. After attaching the brackets, have another person hold the switch on
the plywood base on the wall while you secure it with the M4x32.3mm
screws included with the switch. Refer to Figure 76 for the x530L-
28GPX, x530L-28GTX, x530L-52GPX, or x530L-52GTX switch or
Figure 77 on page 136 for the x530L-10GHXm switch.
Follow these guidelines as you position the switch on the wall:
Position the switch so that the front panel is facing up, left or right.
Refer to Figure 76. Do not install it with the front panel facing down.
Provide sufficient space from other devices or walls so that you can
access the front and back panels, and for adequate air flow for
ventilation.
Figure 76. Securing the x530L-28GPX, x530L-28GTX, x530L-52GPX, or
x530L-52GTX or x530L-52GTX Switch to the Plywood Base
35
17
9
1
1
1
3
1
5
1
7
1
9
21
23
27/S1
28/S2
25
SFP+
26
AT-x530L-28GTX
16
18
20
14
10G
/
1G
46
8
1
0
1
2
2
22
24
FDX
HDX COL
1G LINK
AC
T
100 LINK
AC
T
5G/2.5G/1G LINK
AC
T
100 LINK
AC
T
POR
TS 21-24
POR
T
S 1-20
5G/2.5G/1G/100
CLASS
1
LASER PRODUCT
CONSOLE
4595
Summary of Contents for x530L Series
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 56: ...Chapter 1 Overview 56 ...
Page 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Page 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Page 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...