Chapter 7: Building the Trunk with the Default 10Gbps Stacking Ports
160
Figure 90. Switch Initialization Messages (Continued)
Initializing HA processes:
atmf_agentd, execd, exfx, hostd, atmfd, auth, epsr
hsl, imi, imiproxyd, lldpd, loopprot, mstp, nsm
pim6d, ripngd, rmon, sflowd, vrrpd, bgpd, irdpd
lacp, ospf6d, ospfd, pdmd, pimd, ripd, udldd
Received event network.initialized
Assigning Active Workload to HA processes:
hsl, irdpd, lacpd, loopprotd, mstpd, nsm, ospfd
ripd, rmond, sflowd, vrrpd, authd, epsrd, imi
imiproxyd, lldpd
Received event network.activated
Loading default configuration
..
done!
Received event network.configured
Summary of Contents for x530L Series
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 56: ...Chapter 1 Overview 56 ...
Page 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Page 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Page 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...