x530L Series Installation Guide for Virtual Chassis Stacking
95
Choosing a Site for the Switch
Observe these requirements when planning the installation of the switch.
Before installing the switch in an equipment rack, check that the
rack is safely secured so that it will not tip over. Devices in a rack
should be installed starting at the bottom, with the heavier devices
near the bottom of the rack.
Before installing the switch on a table, check that the table is level
and stable.
The power outlets should be located near the switch and be easily
accessible.
The site should allow for easy access to the ports on the front of
the switch, so that you can easily connect and disconnect cables,
and view the port LEDs.
The site should allow for adequate air flow around the unit and
through the cooling vents on the front and rear panels. (The
ventilation direction is from front to back.)
The site must not expose the switch to moisture or water.
The site must be a dust-free environment.
The site must have dedicated power circuits or power conditioners
to supply reliable electrical power to the network devices.
Do not install the switch in a wiring or utility box because it might
overheat and fail from inadequate air flow.
Warning
Switches should not be stacked on a table or desktop. They could
present a physical safety hazard if you need to move or replace
switches.
E91
Summary of Contents for x530L Series
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 56: ...Chapter 1 Overview 56 ...
Page 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Page 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Page 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...