Publication 1756-UM523F-EN-P - December 2006
Configure and Program the Controller
85
C.
If a higher priority task interrupts the logic, the value of
scan_count.ACC is sent to the secondary controller at the end of
the program in the higher priority task.
D.
If a switchover occurs before the EQU instruction, the secondary
controller starts its execution at the beginning of the program.
The EQU instruction misses the last value of scan_count.ACC.
Take Preventative Actions
If logic seems susceptible to an upset during a switchover, either place
susceptible logic in the highest priority task, or, if the logic must
remain in a lower priority task, take one of these actions:
•
Use UID and UIE Instruction Pairs.
•
Buffer critical data.
Place Susceptible Logic in the Highest Priority Task
This prevents the controller from sending any data to the secondary
controller until the program finishes.
If a switchover occurs during the program, the secondary controller
repeats the scan using the same starting data.
Summary of Contents for 1756-CNB/E
Page 4: ...Publication 1756 UM523F EN P December 2006 Summary of Changes 4 Notes...
Page 10: ...Publication 1756 UM523F EN P December 2006 10 Table of Contents...
Page 26: ...Publication 1756 UM523F EN P December 2006 26 ControlLogix Redundancy System Overview Notes...
Page 42: ...Publication 1756 UM523F EN P December 2006 42 Design the System Notes...
Page 64: ...Publication 1756 UM523F EN P December 2006 64 Configure the System Redundancy Module Notes...
Page 102: ...Publication 1756 UM523F EN P December 2006 102 Configure and Program the Controller Notes...
Page 146: ...Publication 1756 UM523F EN P December 2006 146 Update Modules and Redundant Systems Notes...
Page 168: ...Publication 1756 UM523F EN P December 2006 168 Convert an Existing System to Redundancy Notes...
Page 178: ...Publication 1756 UM523F EN P December 2006 178 Redundant System Restrictions Notes...
Page 185: ......