Publication 1756-UM523F-EN-P - December 2006
60
Configure the System Redundancy Module
2. Start a switchover.
A. Click Synchronization.
B. Choose Initiate Switchover and then choose Yes to continue.
3. Monitor the synchronization progress.
A. Click Synchronization Status.
If the controller contains a large project, the system may spend some time
synchronizing the secondary controller.
B. If the Secondary Readiness remains Disqualified:
•
Make sure the Auto-Synchronization option = Always.
•
See Find the Cause of a Switchover or Disqualification on page 104.
Action
Details
Summary of Contents for 1756-CNB/E
Page 4: ...Publication 1756 UM523F EN P December 2006 Summary of Changes 4 Notes...
Page 10: ...Publication 1756 UM523F EN P December 2006 10 Table of Contents...
Page 26: ...Publication 1756 UM523F EN P December 2006 26 ControlLogix Redundancy System Overview Notes...
Page 42: ...Publication 1756 UM523F EN P December 2006 42 Design the System Notes...
Page 64: ...Publication 1756 UM523F EN P December 2006 64 Configure the System Redundancy Module Notes...
Page 102: ...Publication 1756 UM523F EN P December 2006 102 Configure and Program the Controller Notes...
Page 146: ...Publication 1756 UM523F EN P December 2006 146 Update Modules and Redundant Systems Notes...
Page 168: ...Publication 1756 UM523F EN P December 2006 168 Convert an Existing System to Redundancy Notes...
Page 178: ...Publication 1756 UM523F EN P December 2006 178 Redundant System Restrictions Notes...
Page 185: ......