vi
Table of Contents
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Fire Alarm Application Note ........................................................................................... v
About Fire Alarm Codes......................................................................................................................................................v
Code Enforcement ...............................................................................................................................................................v
Conventions Used in This Manual .................................................................................. x
SECTION 1
General Description ................................................... 1-1
About the FOCUS 200 PLUS System............................................................................................................................. 1-1
Prominent Features......................................................................................................................................................... 1-1
SECTION 2
Installing the Control Unit ....................................... 2-1
About the Control Unit.................................................................................................................................................... 2-1
Before Installing the System ........................................................................................................................................... 2-1
Mounting the Cabinet ..................................................................................................................................................... 2-2
Installing the Cabinet Lock ............................................................................................................................................ 2-2
Grade A Mercantile Premises Listing............................................................................................................................. 2-3
Grade A Mercantile Safe and Vault Listing................................................................................................................... 2-4
Installing the Control's Circuit Board ........................................................................................................................... 2-4
SECTION 3
Installing the Operating Panels .............................. 3-1
About the Operating Panels ............................................................................................................................................ 3-1
Installing the Operating Panels...................................................................................................................................... 3-2
Addressing the Operating Panels ................................................................................................................................... 3-3
Operating Panel Program Mode..................................................................................................................................... 3-5
Adjusting the Contrast Level .......................................................................................................................................... 3-5
SECTION 4
Basic Hardwired Points ............................................ 4-1
About the Hardwired Points ........................................................................................................................................... 4-1
Wiring the Hardwired Points ......................................................................................................................................... 4-2
Point 8 Bell Box Tamper Configuration......................................................................................................................... 4-5
SECTION 5
Gateways ...................................................................... 5-1
About the Gateways......................................................................................................................................................... 5-1
PID Gateway ................................................................................................................................................................... 5-2
Installing the PID Gateway ............................................................................................................................................ 5-5
Installing Sensors to the PID.......................................................................................................................................... 5-7
SIM Gateway................................................................................................................................................................. 5-13
Installing the SIM Gateway.......................................................................................................................................... 5-15
Installing SIM and SIM Sensors.................................................................................................................................. 5-17
RF Gateway (472490).................................................................................................................................................... 5-23
Installing the RF Gateway............................................................................................................................................ 5-24
Installing the RF Receiver ............................................................................................................................................ 5-25
5800 Series Transmitters .............................................................................................................................................. 5-26
Gateway Off-Normal Conditions .................................................................................................................................. 5-28
SECTION 6
Bell Outputs and Auxiliary Relay ............................ 6-1
About the Bell Outputs and Auxiliary Relay.................................................................................................................. 6-1
Output Functions ............................................................................................................................................................ 6-2
Installing the External Sounders ................................................................................................................................... 6-4
Programming the Bell Outputs ...................................................................................................................................... 6-7
Summary of Contents for Commercial Fire & Burglary Alarm System FOCUS 200 PLUS
Page 2: ......
Page 22: ...FOCUS 200 PLUS Installation and Setup Guide 3 6...
Page 28: ...FOCUS 200 PLUS Installation and Setup Guide 4 6...
Page 64: ...FOCUS 200 PLUS Installation and Setup Guide 6 8...
Page 76: ...FOCUS 200 PLUS Installation and Setup Guide 7 12...
Page 110: ...FOCUS 200 PLUS Installation and Setup Guide 10 24...
Page 166: ...FOCUS 200 PLUS Installation and Setup Guide 16 4...
Page 196: ...FOCUS 200 PLUS Installation and Setup Guide 21 4...
Page 204: ...FOCUS 200 PLUS Installation and Setup Guide 22 8...
Page 210: ...Index Index 6...
Page 214: ...A 4...