E 100
GB
02
473
-
E
d
itio
n
01
-
M
a
rc
h
04
Maintenance operations instruction
Safety instructions
B 100
The products are free of leaks when shipped from the factory, for
normal operating conditions.
The user is responsible for maintaining the level of tightness.
Working conditions
During disassembly and reassembly operations on vacuum lines, to
avoid gettering due to dust or finger prints, you are advised to work:
- in a clean room,
- on lent free paper,
- with unpowdered vinyl gloves (clean room gloves),
- to dust each part with filtered dry air,
- to block all the openings in the vacuum lines.
Icons used
2.5
2.5 mm Allen key
10 mm spanner
3.5
3.5 mm Allen key
3
3 mm Allen key
13 mm spanner
17 mm spanner
4 mm Allen key
5
5 mm Allen key
6
6 mm Allen key
12 mm stud
7 mm spanner
8 mm spanner
20 mm spanner
Philips head screwdriver
Screwdriver for slotted
head screws
Voltmeter
Ohmmeter
1/1
Summary of Contents for ASM 142
Page 1: ...ASM 142 142 D ASM GRAPH GRAPH D GRAPH D HELIUM LEAK DETECTOR User s Manual ...
Page 98: ......
Page 106: ......
Page 111: ......
Page 119: ......
Page 124: ......
Page 129: ......
Page 140: ......
Page 144: ......
Page 166: ......