C 301
Basic internal calibration of the leak
detector
5/5
GB
00969
-
E
d
it
io
n
06
-
J
une
08
6
End of the
Close the valve of the calibrated leak (if there is one).
process
These 2 screens appear alternately.
PLEASE,CLOSE He LEAK
OK -> press NEXT
ON TEST PORT!
OK -> press NEXT
Validate the operation.
NEXT
Note: If these operations are not done within a
minute after these screens display, the calibration
is automatically stopped. A message informs the
operator of this stop.
When the calibration is complete, the unit is ready
to start a cycle.
READY FOR CYCLE
...
...
...
STDBY
Note: it is possible to start a test cycle after a
calibration failure.
Summary of Contents for ASM 142
Page 1: ...ASM 142 142 D ASM GRAPH GRAPH D GRAPH D HELIUM LEAK DETECTOR User s Manual ...
Page 98: ......
Page 106: ......
Page 111: ......
Page 119: ......
Page 124: ......
Page 129: ......
Page 140: ......
Page 144: ......
Page 166: ......