B 400
G
B
00218
-
E
d
it
io
n
05
-
J
un
e
08
Before starting up the leak detector
Please acquaint oneself with the safety instructions sheet (
B 100)
and the installation sheet (
B 110)
The performance of the detector (pumping speed, accuracy and
reliability) depends on:
- the vacuum connections
- the frequency and quality of maintenance
- the helium calibration.
Main power switch
Check power voltage
Check that the power voltage is compatible
with the power configuration of the leak
detector: check the indications of the label
located close to the power switch.
Check the oil level of
the rotary vane pump
(ASM 142 -
The pump has been drained: a label affixed on the cover of the unit
indicates this and the filling oil is supplied.
ASM 142 S)
NOTICE
PUMP IS SHIPPED WITHOUT
OIL INSTALLED
consult maintenance manual
CAUTION
ATTENTION
POMPE LIVREE SANS HUILE
A L’INTERIEUR
consulter le manuel d’utilisation
ATTENTION
Recto
Verso
Maintenance of the primary pump
E 750
The pump will be damaged if it runs without oil.
(> 5 mn).
The oil required for the first use is supplied with the detector.
Replacement of oil is the user’s responsability.
The pumps have been tested with A200 oil.
The technical characteristics of the pump are
guaranteed only with the recommended oil.
Installation
Position the unit so there is no possible risk of it falling or tilting.
1/1
Summary of Contents for ASM 142
Page 1: ...ASM 142 142 D ASM GRAPH GRAPH D GRAPH D HELIUM LEAK DETECTOR User s Manual ...
Page 98: ......
Page 106: ......
Page 111: ......
Page 119: ......
Page 124: ......
Page 129: ......
Page 140: ......
Page 144: ......
Page 166: ......