![adept technology Cobra s600 User Manual Download Page 92](http://html2.mh-extra.com/html/adept-technology/cobra-s600/cobra-s600_user-manual_3047342092.webp)
Chapter 7 - Optional Equipment Installation
92
Adept Cobra s600/s800 Robot User’s Guide, Rev H
Figure 7-9. Solenoid Placement Using Mounting Hardware
9. Install the appropriate lengths of 5/32 inch plastic tubing (supplied) into the two
output ports on the manifold.
• Route the tubing up along the tower bracket next to the quill and down
through the center of the quill.
• Use cable ties as needed to secure the tubing.
10. Loosen the securing screw on the AIB chassis, and lower the chassis down flat.
See
for the location of the securing screw.
11. Remove the cable strap plate by removing two screws and split washers. See
. This allows the harness to move when you lift the J1 cover in the next
step.
Figure 7-10. Removing the Cable Strap Plate
Air intake coupling
with spare air line
installed
Tubing connected
to output port
Mounting screws for
solenoid assembly
Two M5 x 8 screws
Cable Strap Plate
Summary of Contents for Cobra s600
Page 1: ...Adept Cobra s600 s800 Robot User s Guide...
Page 2: ......
Page 14: ......
Page 20: ......
Page 52: ......
Page 68: ......
Page 80: ......
Page 116: ......
Page 132: ......
Page 146: ......
Page 151: ......
Page 152: ...5960 Inglewood Drive Pleasanton CA 94588 925 245 3400 P N 03017 000 Rev H...