80
Tru O N E® AT S , I N S TA LL ATI O N A N D O PER ATI N G I N S TR U C TI O N
1
L
CD
, T
O
U
CH
The following table illustrates the path
from the display for accessing informa-
tion on the module:
About
Description
:
Modules (Optional modules)
Ekip Signalling 2K-1 / -2 / -3
SN
Serial number
Version
Software version
Input 1
The logical state of the inputs:
“Off” if not active, “On” if active
Input 2
Output 1
The state of the output contacts:
“Open” if open, “Closed” if closed
Output 2
:
—
Table 5.4 Information of Ekip Signalling 2K-_ -module in HMI
Test
:
Modules (Optional modules)
Ekip Signalling 2K-1 / -2 / -3
Auto Test
:
—
Table 5.5 Configuration and test parameters of Ekip Signalling 2K-_ -module in HMI
Settings (*Default) (continued)
Description
Modules (Optional modules) (continued)
Ekip Signalling 2K-1 / -2 / -3 (continued)
O 11/12, O 21/22, O 31/32 (continued)
Function (continued)
Source 1 Available
No anomalies in S1 voltage supply.
Source 2 Available
No anomalies in S2 voltage supply.
Load Shed 1
Used for shedding non-essential loads before
transferring to non-priority source. Signal is activated
before transferring to non-priority source according to
load shed delay and kept activated until load is
transferred back to priority source.
Elevator pre-signal
Signal is activated and transfer is delayed according to
Elevator pre-signal delay. Signal is kept activated
according to Elevator post-signal delay after transfer.
Contact
Type
NC
Active open
NO*
Active closed
Summary of Contents for TruONE ATS
Page 2: ......
Page 6: ...6 TruONE ATS INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Page 151: ... Notes ...
Page 152: ... Notes ...
Page 153: ... Notes ...
Page 154: ... Notes ...
Page 155: ... Notes ...
Page 156: ... Notes ...
Page 157: ... Notes ...
Page 159: ......