Tru O N E® AT S , I N S TA LL ATI O N A N D O PER ATI N G I N S TR U C TI O N
1
Source 2 priority (no generator)
Switch position I
Switch position O
Switch position II
Source 1 OK
Source 2 OK
Pre-transfer signal
Load shed signal
Override momentary S1 outage delay
Transfer from S1 to S2 delay
Override momentary S2 outage delay
Transfer from S2 to S1 delay
Center-off delay, I - O - II
Pre-transfer S1 to S2 delay
Post-transfer S1 to S2 delay
Pre-transfer S2 to S1 delay
Post-transfer S2 to S1 delay
Load shed delay
Note: The functionality and sequence of ‘Elevator pre- and post-signals’ is equivalent to ‘Pre- and Post-transfer’ features.
—
Table 2.4 Automatic Switching Sequences, Source 2 Priority (No generator)
Summary of Contents for TruONE ATS
Page 2: ......
Page 6: ...6 TruONE ATS INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Page 151: ... Notes ...
Page 152: ... Notes ...
Page 153: ... Notes ...
Page 154: ... Notes ...
Page 155: ... Notes ...
Page 156: ... Notes ...
Page 157: ... Notes ...
Page 159: ......