66
Tru O N E® AT S , I N S TA LL ATI O N A N D O PER ATI N G I N S TR U C TI O N
1
TO
U
C
H
Measurements
Switch Diagnostic
Total operations
I-O-II switches: Total number of transfers I-O, O-II,
II-O and O-I.
I-II switches: Total number of transfers I-II and II-I
Manual operations
Total transfers operated by the handle.
Number of load transfers
Total number of transfers I-II and II-I
Transfer time
Time it took to transfer the load between sources
(ms)
Source fail transfers
Total number of automatic transfers due to source
failures.
Days energized
Total time on S1
Hours
Total time on S2
Hours
Time S1 available
Minutes
Time S2 available
Minutes
Last generator start
MMM DD, YYYY hh:mm:ss
Generator starting time
How long it took for the generator to become
acceptable after latest start (s).
In-phase time
How long it took for the in-phase monitor to
achieve synchronized transfer (s).
Event Log
250 time stamped events, latest first.
Harmonics
Harmonic components up to 15th are calculated
for the selected phase.
Measured
Phase
Disabled*
Phase 1
Phase 2
Phase 3
Voltage
Total distortion
THD for each phase of both voltage sources.
S1 Components
Each harmonic component of the selected S1
phase.
S2 Components
Each harmonic component of the selected S2
phase.
Power Factor
Enabled only when current measurement module is
connected.
Summary of Contents for TruONE ATS
Page 2: ......
Page 6: ...6 TruONE ATS INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Page 151: ... Notes ...
Page 152: ... Notes ...
Page 153: ... Notes ...
Page 154: ... Notes ...
Page 155: ... Notes ...
Page 156: ... Notes ...
Page 157: ... Notes ...
Page 159: ......