Quick start-up guide
18
Building a project and transfering it to the PLC
1. Select
Build Configuration
in the Project menu.
In the beginning of the build process, the changes are
automatically saved to the project. When the build is finished, a
dialog box appears, indicating the success of the build.
2. Click the
Transfer
button in the dialog box.
Note:
When transfering the project to the PLC, you may get a
Software mismatch warning message. If no important software
exists in the PLC, you can ignore the warning and click
OK
. See
B&R documentation for more information on the message.
Forcing values
When Automation Studio is set to Monitor mode, the window can
be used to force values to the control word and speed reference
variables.
1. To open the I/O Mapping window, right-click the REPL-01
module entry in the Project Explorer window, and then click
Open
I/O Mapping
in the pop-up menu.
2. In the View menu, select
Monitor
.
Automation Studio is now in the Monitor mode.
3. To force control word and reference speed values, check the
respective checkboxes in the Force column, and enter the values
in the Force Value column. To start the drive, you could enter
values 16#4FF, 16#47E, 16#47F for the control word, and, for
example, 10000 for the reference.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: [email protected]