
Electrical installation 95
Connection procedure
Making 360 degrees grounding at the cabinet lead-through for the control cables
1. Loosen the EMI conductive cushions.
2. Cut adequate holes to the rubber grommets in the lead-through plate and lead the
cables through the grommets and the cushions into the cabinet.
3. Strip off the cable plastic sheath above the lead-through plate just enough to ensure
proper connection of the bare shield and the EMI conductive cushions.
4. Tighten the EMI conductive cushions around the bare shield.
a
2
3
Side view of the cable lead-through
a) Grommet
b) EMI conductive cushion
c) Lead-through plate
c
Control cable routing
(Auxiliary control cubicle
of PVS800-57-0250kW
and -0315kW)
1
b
Control cable routing (Auxiliary
control cubicle of PVS800-57-
0500kW, -630kW, -0875kW
and -1000kW)
Summary of Contents for PVS800-57-0100kW-A
Page 1: ...ABB solar inverters Hardware manual PVS800 57 central inverters 100 to 1000 kW ...
Page 4: ......
Page 22: ...20 Safety instructions ...
Page 64: ...62 Operation principle and hardware description ...
Page 74: ...72 Mechanical installation ...
Page 90: ...88 Electrical installation PE PE PE ...
Page 124: ...122 Maintenance ...
Page 152: ...150 Dimension drawings Frame R7i 3AUA0000083128 ...
Page 153: ...Dimension drawings 151 AC output 3AUA0000083128 ...
Page 154: ...152 Dimension drawings 3AUA0000083128 One DC input Four DC inputs ...
Page 156: ...154 Dimension drawings R8i 8 DC inputs option 8H382 3AXD50000016935 ...
Page 157: ...Dimension drawings 155 R8i AC output terminals 3AXD50000016935 ...
Page 165: ...Dimension drawings 163 2 R8i AC output terminals 3AXD50000015007 ...
Page 173: ...Dimension drawings 171 3 R8i AC input terminals 3AXD50000015006 ...
Page 178: ...176 Dimension drawings ...
Page 180: ...Contact us www abb com solar 3AUA0000053689 Rev H EN EFFECTIVE 2014 07 09 ...