
Update notice
1
Update notice
Safety
UPDATED bullet points (page 11): Safety in installation and maintenance
Precautions before electrical work
These precautions are for all personnel who do work on the inverter, its input and output cables, the
transformer or the photovoltaic generator.
The notice concerns the following
PVS800-57 Hardware
Manuals
:
Code:
3AXD50000217960 Rev A
Valid:
from 21.12.2017 until the release of Rev J of the
hardware manual
Contents:
the main new features and changes which are not
yet updated to the manual.
The headings in this update notice refer to the modified
subsections in the original English manual. Each heading also
include a page number and a classifier NEW, CHANGED, or
DELETED. The page number refers to page number in the
original English manual. The classifier describes the type of
the modification.
WARNING!
Obey these
instructions to prevent injury or death, or damage to the
equipment. You must be a qualified electrician to do installation and service work. Do
these steps before you do installation or maintenance work on the inverter.
□
1. Clearly identify the work location.
□
2. Disconnect all possible voltage sources.
• Open the AC main switch-disconnector (Q1), the DC main switch (Q2) and the
auxiliary supply disconnector (Q10) of the inverter.
• Open the disconnector of the transformer as the AC main switch-disconnector
(Q1) does not remove the voltage from the AC busbars of the inverter.
• Open the DC circuit breakers of the solar array junction boxes. The DC main
switch (Q2) does not isolate the DC input fuses, cables or terminals from the DC
voltage supplied by the photovoltaic generator.
• Make sure that reconnection is not possible. Lock the disconnectors to open
position and attach a warning notice to them.
• After you have disconnected the inverter, always wait for 5 minutes to let the
intermediate circuit capacitors discharge before you continue.
Code
Revision Language
3AUA0000053689
H
English
EN
3AUA0000083887
H
French
FR
3AUA0000083886
H
German
DE
3AUA0000083888
H
Italian
IT
3AUA0000125276
H
Russian
RU
3AUA0000097080
H
Spanish
ES
Summary of Contents for PVS800-57-0100kW-A
Page 1: ...ABB solar inverters Hardware manual PVS800 57 central inverters 100 to 1000 kW ...
Page 4: ......
Page 22: ...20 Safety instructions ...
Page 64: ...62 Operation principle and hardware description ...
Page 74: ...72 Mechanical installation ...
Page 90: ...88 Electrical installation PE PE PE ...
Page 124: ...122 Maintenance ...
Page 152: ...150 Dimension drawings Frame R7i 3AUA0000083128 ...
Page 153: ...Dimension drawings 151 AC output 3AUA0000083128 ...
Page 154: ...152 Dimension drawings 3AUA0000083128 One DC input Four DC inputs ...
Page 156: ...154 Dimension drawings R8i 8 DC inputs option 8H382 3AXD50000016935 ...
Page 157: ...Dimension drawings 155 R8i AC output terminals 3AXD50000016935 ...
Page 165: ...Dimension drawings 163 2 R8i AC output terminals 3AXD50000015007 ...
Page 173: ...Dimension drawings 171 3 R8i AC input terminals 3AXD50000015006 ...
Page 178: ...176 Dimension drawings ...
Page 180: ...Contact us www abb com solar 3AUA0000053689 Rev H EN EFFECTIVE 2014 07 09 ...