Note: Frame R8 only:
•
If you connected the connector to only one conductor, ABB recommends to
put the conductor under the upper pressure plate.
•
The connectors are detachable, but ABB recommends not to detach them. If
you do, detach and reinstall the connectors as follows.
Input power cable
10. Connect the input power cable as in step
.
8
10b
10a
M5×25/35
9b
9a
8
PE
L1, L2, L3, T1/U, T2/V, T3/W
Frame size
lbf·ft
N·m
lbf·ft
N·m
lbf·ft
N·m
0.9
1.2
1.6
2.2
4.1
5.6
R5
0.9
1.2
7.2
9.8
22.1
30
R6
0.9
1.2
7.2
9.8
29.5
40
R7
0.9
1.2
7.2
9.8
29.5
40
R8
Terminals T1/U, T2/V and T3/W
•
Remove the nut attached to the connector and its busbar.
•
Put the conductor under the connector pressure plate and pre-tighten the
conductor.
•
Put the connector back to its busbar. Start the nut, and turn it by hand to at
least two rotations.
Before using tools, make sure that the nut/screw is not cross-threaded.
Cross-threading damages the drive and causes danger.
22 EN - Quick installation and start-up guide
EN
HI
Summary of Contents for ACS560
Page 2: ......
Page 8: ...6a 6b 6a 6c 7 8 8 8 EN Quick installation and start up guide EN HI ...
Page 52: ...52 EN Quick installation and start up guide EN HI ...
Page 126: ...126 Parameter listing EN HI ...
Page 135: ... Compliance with the European Low Voltage Directive Technical data 135 EN HI ...
Page 170: ...170 ...
Page 175: ...R0 6 R5 R8 6a 6b 6c 7 R5 R8 8 R5 R8 HI त वरित इंस टालेशन और स टार ट अप गाइड 175 EN HI ...
Page 191: ...I O ABB कनेक शन आरेख HI त वरित इंस टालेशन और स टार ट अप गाइड 191 EN HI ...
Page 202: ... डिस प ले 1 I O 2 3 4 5 49 19 1 6 202 HI त वरित इंस टालेशन और स टार ट अप गाइड EN HI ...
Page 213: ... ve ve 2 1 OK 2 3 4 1 2 HI त वरित इंस टालेशन और स टार ट अप गाइड 213 EN HI ...
Page 216: ... 216 HI त वरित इंस टालेशन और स टार ट अप गाइड EN HI ...
Page 218: ...218 HI त वरित इंस टालेशन और स टार ट अप गाइड EN HI ...
Page 278: ...278 पैरामीटर सूची EN HI ...
Page 285: ...IP20 H1 H2 W D तकनीकी डेटा 285 EN HI ...
Page 287: ... यूरोपीय कम वोल टेज निदेश का अनुपालन तकनीकी डेटा 287 EN HI ...