background image

Field Bus Module

BACnet MS/TP Gateway

PumpDrive 2

Supplementary Operating

Manual

Summary of Contents for PumpDrive 2

Page 1: ...Field Bus Module BACnet MS TP Gateway PumpDrive 2 Supplementary Operating Manual...

Page 2: ...contents provided herein must neither be distributed copied reproduced edited or processed for any other purpose nor otherwise transmitted published or made available to a third party without the man...

Page 3: ...rating Manual 4 1 1 General 4 1 2 Function 4 1 3 Field bus module connections 4 1 4 Installing the field bus module 5 1 5 Connecting the field bus module 7 1 6 Setting the parameters of the field bus...

Page 4: ...interface Communication protocol BACnet MS TP Bus terminator External interface EIA 485 RS 485 Transmission rate 9600 baud 19200 baud 38400 baud 57600 baud 115200 baud Device type B ASC Information a...

Page 5: ...vice internal bus communication OK heartbeat detected 4 Green LED signal lamp Communication Valid data package received 5 Red LED signal lamp Token loss token timeout Can be retrofitted Internal T con...

Page 6: ...field bus module into the open slot The plug in module is guided on rails until it engages in the contact Fig 4 Securing the field bus module 2 Secure the field bus module using the 4 cross recessed...

Page 7: ...any further connections in addition to the field bus module for example 230 V alert and 24 V start A cable specified for the field bus module must be used as the connecting cable CAUTION Incorrect in...

Page 8: ...dditional subscribers to BACnet b 5 4 3 2 1 a 5 3 4 1 2 Fig 7 Pin assignment a Module contact arrangement b Connector contact arrangement Table 4 Pin assignment Pin Conductor colour code line CAN open...

Page 9: ...with the BACnet standard 1 120 2 3 4 Fig 10 Bus terminator Bus termination with polarisation is implemented at the start of the MS TP bus in line with the BACnet standard typically at the BACnet route...

Page 10: ...3 12 5 5 Communication Monitoring Time If the BACnet module is not in the token cycle of the MSTP network for a longer period of time a broken wire is reported 0 60 s 20 s 3 12 5 6 Device Name Device...

Page 11: ...ty with the field bus the value written last is valid the control point selected via the digital input has higher priority 1 Field Bus PD2 A RemoteFeedback 5 BV 2 3 6 3 Actual Value Source 0 Local The...

Page 12: ...S 1 2 3 3 System Discharge Pressure PD2 A SuctionPressure 0 AI BARS 1 2 3 2 System Suction Pressure PD2 A DifferentialPressure 0 AI BARS 1 2 3 4 System Differential Pressure PD2 A Flow 0 AI CUBIC METE...

Page 13: ...8 Operating Mode 1 OFF The control point must reference the field bus for writing 2 M 3 AUTO PD2 ControlPointMan 0 AI REVOLUTIONS PER MINUTE 1 3 4 Control Value Manual The control point must referenc...

Page 14: ...from the BACnet side If Out_Of_Service TRUE 1 the parameter is no longer overwritten by BACnet and Present_Value is no longer updated from the PumpDrive side Reliability If process values are formed v...

Page 15: ......

Page 16: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 4074 804 03 EN 01505519...

Reviews: