Chapter 3: Configuration and commissioning
42
ZP1-F Series Installation Manual
In NEN 2535 operating mode, the extended fire routing delay becomes the active
delay to activate fire routing when sounders are stopped (by pressing the
Sounder Start/Stop button) and remain stopped when the standard fire routing
delay time has elapsed.
In EN54-2, NEN 2535 and EN 54-2 Scandinavia operating mode, the extended
fire routing delay becomes the active delay to activate fire routing when an
extended fire routing delay switch (connected to an input configured accordingly)
is activated while the standard fire routing delay elapses.
Adding expansion boards
For information on how to add an expansion board to the fire system and how to
configure it, see “Expansion board configuration” on page 58.
Adding a fire network board
For information on how to add a fire network board to the fire system and how to
configure it, see “Fire network and repeaters configuration” on page 61.
Содержание ZP1-F2
Страница 1: ...ZP1 F Series Installation Manual P N 501 415603 1 60 ISS 12DEC22...
Страница 78: ...Chapter 3 Configuration and commissioning 72 ZP1 F Series Installation Manual...
Страница 82: ...Chapter 4 Maintenance 76 ZP1 F Series Installation Manual...
Страница 92: ...Chapter 5 Technical specifications 86 ZP1 F Series Installation Manual Figure 23 Eight zone cabinet with cover...
Страница 94: ...Chapter 5 Technical specifications 88 ZP1 F Series Installation Manual...
Страница 106: ...Appendix A Configuration presets 100 ZP1 F Series Installation Manual...
Страница 110: ...Appendix B Regulatory information 104 ZP1 F Series Installation Manual...
Страница 113: ......