Chapter 3: Configuration and commissioning
70
ZP1-F Series Installation Manual
Battery startup
To power up the control panel from the batteries, press the battery start button on
the control panel PCB (marked as BAT. START, see Figure 20 below). Keep the
button pressed for approximately 5 seconds.
Figure 20: Battery startup button
Содержание ZP1-F2
Страница 1: ...ZP1 F Series Installation Manual P N 501 415603 1 60 ISS 12DEC22...
Страница 78: ...Chapter 3 Configuration and commissioning 72 ZP1 F Series Installation Manual...
Страница 82: ...Chapter 4 Maintenance 76 ZP1 F Series Installation Manual...
Страница 92: ...Chapter 5 Technical specifications 86 ZP1 F Series Installation Manual Figure 23 Eight zone cabinet with cover...
Страница 94: ...Chapter 5 Technical specifications 88 ZP1 F Series Installation Manual...
Страница 106: ...Appendix A Configuration presets 100 ZP1 F Series Installation Manual...
Страница 110: ...Appendix B Regulatory information 104 ZP1 F Series Installation Manual...
Страница 113: ......