Page 4-12
•
S im i l ar l y , p u s h t h e o t h e r s o c k et o n t h e f l a t
cable coming from the keyboard onto plug P107
on the main cir c uit board.
REINSTALLING THE BASE
Refer to Pictorial 4-15 for the foll o w i n g steps.
•
Posi t i o n t h e k e y b o a rd i n f r o n t o f t h e c h a s s is.
Push the larger socket on one of the f lat cables
c oming fro m t h e k e y b oard o nt o p l u g P 10 5 o n
the main circuit board.
•
Check p l u g s P105 and P107 again to make sure
you have them properly connected.
AI A I N
:
:
:
: .
'
:
:
.
..: 11%11
1
1
ilh
h
h1
CIRC • IT RCAIIII
II
R
KEYBOARD
i'
N
V
Pictorial 4-15
Keyboard cable connections
Содержание Z-100 Series
Страница 2: ...Z 10 eri es User s Manual Winchester u lcm ent I aa systems...
Страница 68: ...Z 217 WINCHESTER DISK CONTROLLER Product Specification Zenith Data Systems November 30 198 2 D Langer...
Страница 84: ...7 4 q 1 a m...
Страница 88: ......
Страница 90: ...Page 2 2...
Страница 118: ...Page 4 26...
Страница 148: ......