NMQ=çÑ=NSQ
fåëíêìÅíáçå=j~åì~ä=^ìêáÖ~=`çãé~Åí=ÉåMP
SK=léÉê~íáçå
`êçëë_É~ã
®
çéÉê~íáçå
11 To start the outgassing procedure, click
on
Go
.
12 Monitor the system vacuum by observing the
System Vacuum
value in the
Outgassing
panel.
If, after the 5th loop, the vacuum has not reached 2 x 10
-5
mbar or better, which is the pressure
necessary for deposition, repeat the procedure.
In this case, you should increase the number of loops in future outgassing procedures.
The outgassing procedure ends automatically.
If you wish to stop the procedure prematurely, click
Stop
.
How to
continue
Continue with selecting deposition conditions.
Содержание AURIGA Compact Crossbeam
Страница 1: ...AURIGA Compact Crossbeam workstation Instruction Manual ...
Страница 50: ...RM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP PK aÉëÅêáéíáçå ìëíçãÉê ëÉêîáÅÉ ...
Страница 54: ...RQ çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP RK fåëí ää íáçå ...
Страница 150: ...NRM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP UK qêçìÄäÉëÜççíáåÖ mçïÉê ÅáêÅìáí ...
Страница 156: ...NRS çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP NNK ÄÄêÉîá íáçåë ...
Страница 160: ...NSM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP NPK aÉÅä ê íáçå çÑ ÅçåÑçêãáíó ...