6.6.4.2. Outgassing the platinum reservoir
(only with five-channel GIS)
Outgassing is required to remove excess gas from the reservoir. If a channel is not used daily, the
gas pressure in the reservoir is built up. Therefore, outgassing is necessary to avoid that the FIB
vacuum level exceeds and decreases abruptly when the reservoir valve is opened.
Outgassing basically consists of a series of open and close cycles to let small amounts of gas out
of the reservoir.
Procedure:
1
Switch off the SEM EHT.
2
Switch off the FIB EHT.
3
Open the
Panel Configuration Bar
.
4
Double-click
Gas Injection System
.
The
Gas Injection System
panel opens.
5
Ensure that the
Temperature Control
checkboxes for
Reservoir
and
Capillary
of
Platinum
are activated.
Содержание AURIGA Compact Crossbeam
Страница 1: ...AURIGA Compact Crossbeam workstation Instruction Manual ...
Страница 50: ...RM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP PK aÉëÅêáéíáçå ìëíçãÉê ëÉêîáÅÉ ...
Страница 54: ...RQ çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP RK fåëí ää íáçå ...
Страница 150: ...NRM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP UK qêçìÄäÉëÜççíáåÖ mçïÉê ÅáêÅìáí ...
Страница 156: ...NRS çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP NNK ÄÄêÉîá íáçåë ...
Страница 160: ...NSM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP NPK aÉÅä ê íáçå çÑ ÅçåÑçêãáíó ...