3-8 Project Maintenance
3
−
16
Builder
Chapter 3 Operating the Project File
Duplicate
1. Select the [Duplicate] tab.
2. Set the Source Project and Destination Project.
Number Item
Contents
1)
Source Project
Sets the full path for the project file name of the source
project. Automatically displays projects that have been opened
with Builder.
2) Destination
Project
Sets the full path for the project file name of the destination
project.
3. Click the [Execute] button. A confirmation dialog box will be displayed.
Click the [Yes] button to duplicate the project.
M
M
M
E
E
E
M
M
M
O
O
O
♦
An existing project file can be specified as the Destination Project. However,
all of the current data will be deleted. (The following confirmation dialog
box is displayed.)
In addition, if the same project is specified for both Source Project and
Destination Project, the data will be lost since deletion is performed before
duplication. Therefore, take care to not set the same project in both fields.
1)
2)