6 - 16
–
+
ELEC
CHARGING SYSTEM (TT-R90E)
EC624000
COUPLERS AND LEADS CONNECTION
INSPECTION
1. Check:
• Couplers and leads connection
Rust/dust/looseness/short-circuit
→
Repair or replace.
CHARGING VOLTAGE INSPECTION
1. Start the engine.
2. Inspect:
• Charging voltage
Out of specification
→
If no failure is
found in checking the source coil resis-
tance, replace the rectifier/regulator.
Tester (+) lead
→
Red lead
1
Tester (–) lead
→
Black lead
2
Charging
voltage
Tester selector
position
14.0 ~ 15.0 V at
5,000 r/min
DCV-20
W B
R Y
/
R
1
2
3. Inspect:
• Lighting coil resistance
Out of specification
→
Replace.
Tester (+) lead
→
White lead
1
Tester (–) lead
→
Black lead
2
Lighting coil
resistance
Tester selector
position
0.64 ~ 0.96
Ω
at
20 °C (68 °F)
Ω
×
1
W Sb
Y B
1
2
Содержание TT-R90(V)
Страница 20: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 45: ...GEN INFO MEMO...
Страница 111: ...2 18 SPEC MEMO...
Страница 137: ...INSP ADJ MEMO...
Страница 345: ...ELEC MEMO...
Страница 357: ...ELEC MEMO...
Страница 373: ...ELEC MEMO...
Страница 379: ...ELEC MEMO...
Страница 389: ......