
2 - 23
SPEC
CABLE ROUTING DIAGRAM
È
Pass the start switch lead,
main switch lead, engine stop
switch lead and throttle cable
through the cable guide.
É
Pass the fuel tank breather
hose through the hose guide.
Ê
Pass the carburetor breather
hose through the hose guide.
Ë
Fasten the carburetor heater
lead, main switch lead, engine
stop switch lead and start
switch lead.
Ì
After fastening the CDI mag-
neto lead, cut off any excess
from the plastic locking tie end.
Í
Fasten the battery leads to the
bracket with the plastic locking
tie. For fastening, pass the
plastic locking tie through the
hole in the bracket.
Î
After fastening the starter
motor lead, cut off any excess
from the plastic locking tie end.
Ï
After fastening the CDI mag-
neto lead, cut off any excess
from the plastic locking tie end.
Ð
Position the start switch cou-
pler and engine stop switch
coupler between the carburetor
breather hose and thermo
switch.
Ñ
Make sure that the CDI unit
lead does not contact the
thermo switch bracket.
A
A
A
C
C
D
B
B
B
B
F
F
F
E
E
D
A - A
B - B
E - E
C
F - F
G - G
D
K
K
Q
R
Ñ
8
E
H
Ô
2
3
4
6
5
4
3
2
1
J
I
H
G
F
E
D C
B
A
0
Í
9
8
Ë
K
7
S
W
U V
A
0
Ú
T
9
9
Q
P
P
T
9
Ò
Ó
Õ
Ö
Ê
É
È
Ï
Ø
Ù
E
G
G
A
P
O
N
M
L
9
Ð
9
Î
Û
Ý
25 mm (1.0 in)
×
Ì
35 ~ 45 mm
(1.38 ~ 1.77 in)
30 ~ 40 mm
(1.18 ~ 1.57 in)
Ü
Содержание TT-R90(V)
Страница 20: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 45: ...GEN INFO MEMO...
Страница 111: ...2 18 SPEC MEMO...
Страница 137: ...INSP ADJ MEMO...
Страница 345: ...ELEC MEMO...
Страница 357: ...ELEC MEMO...
Страница 373: ...ELEC MEMO...
Страница 379: ...ELEC MEMO...
Страница 389: ......