POWER UNIT
5-14
E
POWR
REMOVING/INSTALLING THE POWER UNIT
1
2
3
4
5
21 Nm(2.1 m kgf,15ft lb)
8
80 mm
6
16 mm
6
25 mm
8
12 mm
572
Order
Job/Part
Q’ty
Remarks
1
Oil level gauge
1
2
Apron
1
3
Power unit
1
4
Dowel pin
2
5
Upper casing gasket
1
Not reusable
For installation, reverse the removal
procedure.
Содержание F40BED
Страница 60: ...SPEC 2 12 MAINTENANCE SPECIFICATIONS E DIMENSIONS H9 L3 L7 L6 L2 L1 H2 H1 H7 H4 H3 H8 H6 W5 W6 W1 L4 A1 A3 A2 ...
Страница 126: ...GENERAL 3 25 E CHK ADJ LUBRICATION POINTS Apply Water resistant grease ...
Страница 128: ...CHK ADJ 3 26 GENERAL E ...
Страница 129: ...3 26 CHK ADJ F D ES ...
Страница 272: ...E LOWR BACKLASH 6 34 MEASURING THE FORWARD GEAR BACKLASH 6 34 MEASURING THE REVERSE GEAR BACKLASH 6 36 ...
Страница 528: ......
Страница 529: ......
Страница 536: ......
Страница 537: ...Printed on recycled paper Printed in Japan Sep 1999 1 7 1 F40B YAMAHA MOTOR CO LTD ...