E
1
2
3
4
5
6
7
8
9
–
+
ELEC
IGNITION CONTROL SYSTEM
..................................................................... 8-16
CHECKING THE MAIN SWITCH ........................................................... 8-18
CHECKING THE ENGINE STOP SWITCH ............................................. 8-18
MEASURING THE PULSER COIL OUTPUT PEAK VOLTAGE .............. 8-19
CHECKING THE OIL PRESSURE SWITCH CONTINUITY .................... 8-19
MEASURING THE ENGINE COOLING WATER TEMPERATURE
SENSOR RESISTANCE ......................................................................... 8-19
STARTING SYSTEM (WHD, ED, ET)
............................................................ 8-21
CHECKING THE BATTERY .................................................................... 8-22
CHECKING THE FUSES ........................................................................ 8-22
CHECKING THE WIRE HARNESS CONTINUITY ................................. 8-22
CHECKING THE WIRE CONNECTIONS ............................................... 8-23
CHECKING THE MAIN SWITCH ........................................................... 8-23
CHECKING THE STARTER RELAY ........................................................ 8-23
STARTER MOTOR
........................................................................................ 8-24
DISASSEMBLING/ASSEMBLING THE STARTER MOTOR .................. 8-24
REMOVING THE STARTER MOTOR PINION ....................................... 8-26
CHECKING THE STARTER MOTOR PINION ........................................ 8-26
CHECKING THE ARMATURE ................................................................ 8-26
MEASURING THE BRUSHES ............................................................... 8-27
CHARGING SYSTEM (WHD, ED, ET)
.......................................................... 8-29
CHECKING THE FUSES ........................................................................ 8-30
CHECKING THE BATTERY .................................................................... 8-30
CHCKING THE RECTIFIER/REGULATOR OUTPUT PEAK VOLTAGE ... 8-30
CHECKING THE LIGHTING COIL OUTPUT PEAK VOLTAGE .............. 8-30
Содержание F40BED
Страница 60: ...SPEC 2 12 MAINTENANCE SPECIFICATIONS E DIMENSIONS H9 L3 L7 L6 L2 L1 H2 H1 H7 H4 H3 H8 H6 W5 W6 W1 L4 A1 A3 A2 ...
Страница 126: ...GENERAL 3 25 E CHK ADJ LUBRICATION POINTS Apply Water resistant grease ...
Страница 128: ...CHK ADJ 3 26 GENERAL E ...
Страница 129: ...3 26 CHK ADJ F D ES ...
Страница 272: ...E LOWR BACKLASH 6 34 MEASURING THE FORWARD GEAR BACKLASH 6 34 MEASURING THE REVERSE GEAR BACKLASH 6 36 ...
Страница 528: ......
Страница 529: ......
Страница 536: ......
Страница 537: ...Printed on recycled paper Printed in Japan Sep 1999 1 7 1 F40B YAMAHA MOTOR CO LTD ...