Xerox WorkCentre 450c/450cp Service Manual
Page 2-39
RAP 9.0: RAM Test
This RAP tests the WorkCentre’s static
and dynamic RAM.
The WorkCentre’s static and dynamic
ram is tested during system startup.
However, you can run a RAM test from
the service menu.
1. Check the output of the Ni-Metal
battery (RAP 8.0: Ni-Metal
Battery on page 2-38).
2. Power on the machine.
3. In the Service Menu, perform the
RAM test.
Result:Test passed?
No:
Replace the main circuit board
(REP 5.1.2: Main Board on page
4-39).
Yes:
End of RAP.
www.printcopy.info
www.printcopy.info