Before filling, it is recommended that the buffer temperatures are checked. If the existing temperature is
already sufficient, furnace filling is not recommended, rather the furnace should be allowed to burn out.
When filling is not necessary
(Smoldering gas extraction is activated by the system operator)
This instruction is displayed if the system operator wants to activate smoldering gas extraction and the
furnace is currently in part load mode. Currently sufficient demand is not guaranteed, the furnace is
already being operated at reduced power. Only add more fuel if there is sufficient demand. If this is not
the case, it is recommended that adding fuel is not carried out and the furnace is allowed to burn out.
When filling not is necessary
(Smoldering gas extraction is activated by the system operator)
This instruction is displayed if the system operator wants to activate smoldering gas extraction and the
furnace has already run for a long time since the heat exchangers were cleaned. Only add fuel if more
heat is required. If this is not the case, please let the furnace burn out, so that automatic heat exchanger
cleaning can be carried out.
Upon completion of the burn-off
This instruction is displayed if the burn-off has ended and the furnace was already being operated in part
load mode. This instruction provides information to the system operator. At the end of the last burn-off
the furnace had little demand and had to be operated with reduced power. Ensure that at the next firing
there is sufficient demand.
11: Bulk Materials Mode
No
NOTE!
The boiler is already
controlled in “Part Load”
Sufficent demand is not
guaranteed! Filling the
boiler is only recommended if
sufficent demand is assured!
Do you still wish to add more?
No
NOTE!
The boiler has already run
for a lengthy period since the
last time the heat exchangers
were cleaned! It is
recommended to let the boiler
cool down so that cleaning can
be carried out!
Do you still wish to add more?
NOTE!
The boiler was already being
controlled in “Part Load”
during the last burn-off. The
demand was insufficient
Please ensure for the next
firing that there is
sufficent demand!