![WinGD X92DF Скачать руководство пользователя страница 496](http://html1.mh-extra.com/html/wingd/x92df/x92df_operation-manual_986583496.webp)
9.4
Clean the turbocharger during operation
Periodicity
Description
Weeks
1
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
Cleaning fluid
A/R
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
CAUTION
Damage Hazard: For an engine with LP SCR system, do not do this procedure, if there is
gas flow through the LP SCR reactor. This could cause damage to the components of the
SCR system.
PRELIMINARY OPERATIONS
•
None
X92DF
AA00-6500-00AAA-200A-A
Operation Manual
Clean the turbocharger during operation
Winterthur Gas & Diesel Ltd.
- 496 -
Issue 002 2020-08
Содержание X92DF
Страница 18: ...X92DF Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 18 Issue 002 2020 08...
Страница 147: ...X92DF Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 147 Issue 002 2020 08...
Страница 253: ...X92DF Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 253 Issue 002 2020 08...
Страница 425: ...7 Installation 7 1 Installation 426 X92DF Operation Manual Winterthur Gas Diesel Ltd 425 Issue 002 2020 08...