![WinGD X92DF Скачать руководство пользователя страница 466](http://html1.mh-extra.com/html/wingd/x92df/x92df_operation-manual_986583466.webp)
8.14
Change-over from MDO to HFO manually
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
2.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
WinGD recommends to do a manual change-over only, if an automatic change-over
system is not installed or if the automatic change-over system is unserviceable.
X92DF
AA00-0000-00AAA-131H-A
Operation Manual
Change-over from MDO to HFO manually
Winterthur Gas & Diesel Ltd.
- 466 -
Issue 002 2020-08
Содержание X92DF
Страница 18: ...X92DF Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 18 Issue 002 2020 08...
Страница 147: ...X92DF Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 147 Issue 002 2020 08...
Страница 253: ...X92DF Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 253 Issue 002 2020 08...
Страница 425: ...7 Installation 7 1 Installation 426 X92DF Operation Manual Winterthur Gas Diesel Ltd 425 Issue 002 2020 08...