Typical
vertical
track
assembly
Jamb
bracket
Flag
angle
Flag angle lag screw locations
5/16” x 1-5/8”
Lag screws
Bottom
section
Track
rollers
12R FA
3/8” to 5/8”
Spacing
Bottom section
15R QI
12R QI
Floor
Track roller
15R FA
Vertical track
6A
6B
6C
NOTE:
Repeat the
same process for
the right hand side.
Attaching Strut(s) To Section
Tools Required: Power drill, 7/16” Socket driver, Step ladder, Tape measure, Safety
glasses, Leather gloves
7
NOTE:
For door models 9700, 9510 or 9800 and is not windloaded, the struts are factory
attached to the section.
IF YOUR DOOR CAME WITH A STRUT:
Attach the Strut to the top section, as shown in the
illustration below.
=
=
Strut (U-shape)
(attached to top rib)
Top section
Top rib
(2) 1/4”-14 x 5/8”
Self tapping screws
(2) 1/4”-14 x 5/8”
Self tapping screws
Center line of top section
(2) 1/4”-20 x 11/16”
Self drilling screws
(2) 1/4”-20 x 11/16”
Self drilling screws
6” 6”
End cap
7A
7B
7B
7E
7C
6C
7D
30” To 36”
Top section
Top section
7E
7D
IF YOUR DOOR CAME WITH AN ASYMMETRICAL STRUT:
Attach the asymmetrical Strut to
the top section, as shown in the illustrations below.
IMPORTANT:
WHEN SECURING THE ASYMMETRICAL STRUT TO THE TOP SECTION, IT IS
RECOMMENDED NOT TO INSTALL ANY FASTENERS INTO THE SHORT LEG OF THE ASYM-
METRICAL STRUT.
Strut
(asymmetrical)
(attached to top rib)
Strut
(asymmetrical)
(attached to top rib)
Long leg
Short leg
Long leg
Short
leg
Top section
Top section
Top rib
Top rib
7A
=
=
(2) 1/4”-14 x 5/8”
Self tapping screws
(2) 1/4”-14 x 5/8”
Self tapping screws
Center line of top section
(2) 1/4”-20 x 11/16”
Self drilling screws
(2) 1/4”-20 x 11/16”
Self drilling screws
30” To 36”
6” 6”
End cap
7B
7B
7C
7C
7D
7E
7E
Top section
7E
Top section
7D
FOR WINDLOADED DOORS:
NOTE:
For windloaded doors, it is important to install the correct gauge of strut, the correct
type / height of the strut, the correct quantity of struts and in the correct strut locations in ac-
cordance with each specific windload design pressure drawings to ensure wind performance
and regulatory compliance.
FOR WINDLOADED DOOR MODELS 9100, 9405, 9600, 5120, 5145:
Refer to your Wind-
load Specification Sheet and install the Struts, then install the Roller Slides onto your sections
accordingly.
FOR WINDLOADED DOOR MODELS 9700, 9510:
Refer to your Windload Specification
Sheet and install the Strut(s), then install the Hinge Brackets onto your sections accordingly.
FOR WINDLOADED DOOR MODEL 9800:
Refer to your Windload Specification Sheet and
install the Hinge Reinforcing Brackets, then the Strut(s) onto your sections accordingly.
Attaching Drawbar Operator Bracket
Tools Required: Power drill, 7/16” Socket driver, Phillips head screwdriver, Locking
pliers, Tape measure, Safety glasses, Leather gloves
8
NOTE:
If you’re installing a drawbar operator, the drawbar operator bracket must be mounted
and secured prior to installing top section.
IMPORTANT:
TO AVOID POSSIBLE DAMAGE TO YOUR DOOR, WAYNE DALTON RECOM-
MENDS REINFORCING THE TOP SECTION WITH A STRUT.
IMPORTANT:
WHEN CONNECTING A DRAWBAR OPERATOR TYPE GARAGE DOOR OPENER
TO THIS DOOR, A WAYNE DALTON OPERATOR/ DRAWBAR OPERATOR BRACKET MUST
BE SECURELY ATTACHED TO THE TOP SECTION OF THE DOOR, ALONG WITH ANY STRUT
PROVIDED WITH THE DOOR. THE INSTALLATION OF THE DRAWBAR OPERATOR MUST BE AC-
CORDING TO MANUFACTURER’S INSTRUCTIONS AND FORCE SETTINGS MUST BE ADJUSTED
PROPERLY.
NOTE:
If a strut was installed, you can use two of the 1/4” - 20 x 11/16” self-drilling screws
previously used to attach the strut instead of two 1/4” - 14 x 5/8” self-tapping screws when
attaching drawbar operator bracket to strut.
NOTE:
When attaching drawbar operator bracket to top section with strut, apply additional
pressure to thread into the strut.
=
8A
Typical top section
Center line of
top section
Drawbar operator
bracket label
7
Содержание 9100
Страница 21: ......