
4 - Lubricate and Assemble the Stitch Head - Install the Stitch-wire
G8 Stitch Head Maintenance Kit Instructions
85
4.13.3
Adjust the Clincher Side-to-side Alignment
Tools:
• Ring spanner: 13mm
4.14
Install the Stitch-wire
See Chapter 4 of the PSQ Service manual or Chapter 6 of the PSQ User Man-
ual.
Stitch head
M8 nut
Stitcher mounting plate
FIGURE 4:34. Stitch head mounting.
Step
Action
Information
1
Lift the clincher frame.
2
Lift the PSQ main deck.
3
Loosen the M8 nut behind the
stitcher mounting plate.
4
Move the stitch head as neces-
sary.
5
Tighten the M8 nut.
6
Lower the PSQ main deck.
7
Lower and lock the clincher frame.
8
Check the stitch head to clincher
alignment and adjust as neces-
sary.
Содержание G8
Страница 100: ...5 List of Changes 96 G8 Stitch Head Maintenance Kit Instructions Appendix A New chapter...
Страница 111: ......