Preparing for Breeze 2 operation
4-13
Before purging
•
Make sure the eluent is filtered and degassed.
•
Prime and purge the pump with fresh eluent as described in the section
above.
•
Ensure the pump’s reference valve knob is turned to the left, directing
the eluent flow to the system (for the 1525µ pump, position the vent
valve knob to the system).
When you change between two eluents that are not totally miscible, perform
the steps in this procedure using an intermediate eluent before purging with
the final eluent. See
Purging
To purge the flow path:
1. Determine flow rate and gradient settings appropriate for your column
and application, and then follow
through
on
2. Allow the pump to run for a few minutes to complete the purge.
Tip:
The amount of running time required to purge the flow path
depends on total system volume, eluent miscibility, flow rate, and so on.
3. Verify that the flow exiting to waste is normal and consistent for the
specified flow rate, and then click the Stop Flow icon
in the Run
Samples window to stop the flow.
For information about creating an instrument method to prime and purge the
pump, refer to the Breeze 2 online Help.
Equilibrating the system via Breeze 2 control
Equilibrate the system to achieve a final state of system readiness for running
samples (see
Caution:
To avoid damaging the column, ensure any changes to
conditions that affect the column, such as flow or pressure, are gradual.
Содержание 1500-Series
Страница 14: ...xiv Table of Contents ...
Страница 32: ...1 18 Introduction ...
Страница 50: ...2 18 Installing the HPLC Pump ...
Страница 84: ...3 34 Installing Options and Accessories ...
Страница 108: ...4 24 Preparing for Operation ...
Страница 160: ...A 14 Safety Advisories ...
Страница 184: ...C 16 Solvent Considerations ...