![Waters 1500-Series Скачать руководство пользователя страница 86](http://html1.mh-extra.com/html/waters/1500-series/1500-series_operators-manual_875743086.webp)
4-2
Preparing for Operation
Startup and initial preparation
Before you use your data control software to ready the pump for making
chromatographic runs, familiarize yourself with these procedures and
recommendations:
•
Powering-on the pump
•
Recommendations for preparing the pump for operation
•
Dry priming the pump
•
Operating the pump with the integral vacuum degasser
•
Operating the pump with the plunger seal wash system
•
Operating within the pump’s maximum flow rate
Powering-on the pump
Requirements:
•
Power-on the pump and other chromatographic system devices before
you power-on the system workstation, and startup the data control
application.
•
Ensure the pump is installed according to the instructions in
.
•
Ensure the options and accessories included with your pump are
installed according to the instructions in
To power-on the pump, locate the power switch on the left-hand side panel
and set it to the 1 (ON) position.
Pump preparation recommendations
The procedures to prepare your pump for operation depend on the status of
your chromatography system, as indicated in the following table. Use this
table as a quick reference guide for determining when to perform certain
preparation procedures.
Pump preparation recommendations
Status
Prime
Purge
Equilibrate
Initial operation
Содержание 1500-Series
Страница 14: ...xiv Table of Contents ...
Страница 32: ...1 18 Introduction ...
Страница 50: ...2 18 Installing the HPLC Pump ...
Страница 84: ...3 34 Installing Options and Accessories ...
Страница 108: ...4 24 Preparing for Operation ...
Страница 160: ...A 14 Safety Advisories ...
Страница 184: ...C 16 Solvent Considerations ...