Preparing for Breeze 2 operation
4-11
For software-release-specific details, see the release notes for the Waters
1500-series pumps and the Waters Breeze 2 software.
Power-on the pump and other chromatographic system devices before you
power-on the Breeze 2 system workstation, and start the Breeze 2 application
).
Priming and purging the pump via Breeze 2 control
You must prime and purge the pump to ensure its proper operation (see
).
Before priming and purging the pump
•
If the pump is dry, dry prime it before proceeding (see
•
Ensure the eluent flow is directed to waste—bypassing any connected
components downstream of the pump—by turning the pump’s reference
valve knob 1/2-turn to the right (for the 1525µ pump, position the vent
valve knob to Vent).
To prime and purge the pump:
1. At the Breeze 2 workstation, log in to Breeze 2.
2. In the Select Project and System dialog box, verify that your
chromatographic system, with a 1500-series pump, is configured and
online.
If you did not yet create a chromatographic system with the 1500-series
pump, do so now.
•
Ensure the pump is properly configured in the Node Properties,
which allows you to scan for available instruments (including the
pump), and set the pump-head size in the Instruments tab (for
1525µ and 1525EF only).
•
Bring the system online.
For detailed instructions, refer to the Breeze 2 online Help.
Содержание 1500-Series
Страница 14: ...xiv Table of Contents ...
Страница 32: ...1 18 Introduction ...
Страница 50: ...2 18 Installing the HPLC Pump ...
Страница 84: ...3 34 Installing Options and Accessories ...
Страница 108: ...4 24 Preparing for Operation ...
Страница 160: ...A 14 Safety Advisories ...
Страница 184: ...C 16 Solvent Considerations ...