2-4
Installing the HPLC Pump
•
Bottle holder
•
Certificate of structural validation
To unpack a 1500-series pump:
1. Open the carton and remove the startup kit and other items from the top
of the carton.
2. Using both hands, lift the pump (and its foam packing material) out of
the carton.
3. Carefully set the pump down, and then remove the foam packing
material from both ends of the pump.
4. Check the contents of the startup kit against the startup kit parts list to
confirm that all items are included.
5. Verify that the serial number on the inside-left frame of the pump
matches the serial number on the certificate of structural validation.
Tip:
Keep the certificate of structural validation with this guide for
future reference.
6. Inspect all items for damage, and immediately report any shipping
damage to both the shipping company and your Waters representative.
If shipping damage occurred, contact Waters Customer Service. Refer to
Waters Licenses, Warranties, and Support
for complete information on
shipping damages and claims.
Connecting power and signal cables
For proper operation, the 1500-series HPLC pump requires these items:
•
A grounded, AC power supply with no abrupt voltage fluctuations
•
If using Ethernet communications, a connection to a data control system
and other Ethernet devices in the HPLC system
•
If using IEEE-488 communications, a unique IEEE-488 address for the
pump, and an IEEE-488 connection to a data control system and other
IEEE-488 devices
•
If using an optional manual injector, an inject-start output connection
for the detector (see
Содержание 1500-Series
Страница 14: ...xiv Table of Contents ...
Страница 32: ...1 18 Introduction ...
Страница 50: ...2 18 Installing the HPLC Pump ...
Страница 84: ...3 34 Installing Options and Accessories ...
Страница 108: ...4 24 Preparing for Operation ...
Страница 160: ...A 14 Safety Advisories ...
Страница 184: ...C 16 Solvent Considerations ...