24
Overview
WAGO I/O System 750
750-8210/040-000 PFC200; G2; 4ETH; XTR
Manual
Version 1.7.0, valid from FW Version 04.01.10(23)
•
a DNS server
•
a CODESYS V3 Runtime Environment
Based on IEC-61131-3 programming, data processing takes place on site in the
controller. The logical process results can be output directly to the actuators or
transmitted via a connected fieldbus to the higher level controller.