XR3D-6 Maintenance & Troubleshooting
EM-XR3D-6-001-EN.D
3-1
©2011 VOTI Inc.
3 P
REVENTIVE
M
AINTENANCE
The XR3D-6 is a robust unit that requires minimal maintenance and the maintenance schedule
depends on the environment in which it functions. For example, though the Calibration and the
X-ray System tests are performed on initial installation, it is recommended that a certified VOTI
technician performs a 6-month or 1-year.
Task
Time Period
Cleaning
As Required
Check for Digital
Inputs Outputs
using DIOX
Initial installation.
6 month or 1 year.
Verify 12VDC component functionality.
Performance
Verification
One time per year to verify the scanner performance (ASTM Testing).
X-ray System Test
Initial installation.
6 month or 1 year.
After each maintenance task where the machine has been opened to verify the integrity of
the X-ray source.
Seasoning of the
X-ray Generator
Tube
Initial installation.
After any power outage longer than 3 days.
Calibration
Initial installation.
6-month or 1 year verification to ensure Z
eff
image colour ratios and an accurate atomic
number.
3.1 Cleaning
The XR3D-6 may require dusting or cleaning, specifically around the photoelectric sensor/emitter
apertures, the camera, or the conveyor belt. Cleaning or dusting should be performed using
compressed air or a damp cloth.
1. Turn off the power to the XR3D-6 and tie a Do not Operate tag to the Circuit Breaker.
2. Remove any dirt or other debris from the camera surface or the photoelectric sensor/emitter
holes (in the tunnel) using a can of compressed air.
3. If any dirt or liquid has been spilled on the conveyor belt, clean with a gentle detergent on a
damp cloth.
Do not use the detergent directly on the conveyor belt to prevent spillage into the electronics.
Содержание XR3D-6
Страница 2: ...XR3D 6 Maintenance Troubleshooting ii EM XR3D 6 001 EN D 2011 VOTI Inc...
Страница 5: ...XR3D 6 Maintenance Troubleshooting EM XR3D 6 001 EN D v 2011 VOTI Inc 7 XR3D 6 Safety Features 7 1...
Страница 6: ......
Страница 20: ...XR3D 6 Maintenance Troubleshooting 2 8 EM XR3D 6 001 EN D 2011 VOTI Inc...
Страница 32: ...XR3D 6 Maintenance Troubleshooting 3 12 EM XR3D 6 001 EN D 2011 VOTI Inc...
Страница 48: ...XR3D 6 Maintenance Troubleshooting 3 28 EM XR3D 6 001 EN D 2011 VOTI Inc...
Страница 52: ...XR3D 6 Maintenance Troubleshooting 4 4 EM XR3D 6 001 EN D 2011 VOTI Inc...