151
A
Acknowledging a fault display.................................... 93
Actuator test............................................................... 91
Assembly..................................................................128
B
Boiler draining
– DHW side................................................................ 54
– Heating water side................................................ 101
Boiler water temperature sensor.............................. 103
Boosting DHW heating............................................. 113
Brief scans................................................................. 90
Burner gasket.............................................................49
Burner gauze assembly............................................. 49
Burner installation...................................................... 50
Burner removal...........................................................48
C
Calling up fault messages.......................................... 93
Calling up the service level........................................ 89
Calling up the service menu.......................................89
Checking functions.....................................................91
Cleaning the heating surfaces..............................50, 52
Codes for commissioning...........................................59
Combustion chamber, cleaning............................50, 52
Combustion controller.............................................. 124
Combustion quality, checking.....................................58
Commissioning...........................................................38
Condensate drain.......................................................51
Connection diagrams............................................... 125
Control unit service position..................................... 100
Converting gas type................................................... 44
Cylinder cleaning........................................................55
Cylinder temperature sensor....................................103
D
Date, setting............................................................... 40
Diaphragm expansion vessel..................................... 38
E
Electronic combustion controller.............................. 124
Extension
– AM1....................................................................... 115
– EA1........................................................................116
– Internal H1.............................................................113
– Internal H2.............................................................114
Extension kit for heating circuit with mixer .............. 109
External blocking...................................................... 118
External demand...................................................... 119
F
Fault codes.................................................................93
Fault history................................................................93
Fault manager............................................................ 65
Fault memory............................................................. 93
Faults......................................................................... 93
Fill function............................................................... 119
Fill water.....................................................................38
Flow temperature sensor......................................... 103
Flue gas temperature sensor................................... 106
Function descriptions............................................... 112
Fuse/MCB................................................................ 109
G
Gas supply pressure.................................................. 45
Gas train ....................................................................45
Gas type.....................................................................43
Gas type conversion.................................................. 44
H
Heating circuit allocation.......................................... 123
Heating curve............................................................. 64
Heating curve level.....................................................65
Heating curve slope................................................... 65
Heat-up time.............................................................122
I
Ignition........................................................................50
Ignition electrodes...................................................... 50
Ionisation electrode.................................................... 50
L
Language, changing...................................................39
LON............................................................................65
– Fault monitoring...................................................... 66
– Subscriber check.....................................................66
– Subscriber number setting...................................... 65
LON communication module......................................65
M
Magnesium anode
– Anode, checking......................................................55
– Anode, replacing..................................................... 55
– Checking the anode connection..............................53
– Testing the anode current........................................53
Manufacturer's certificate ........................................ 150
Mixer open/closed.................................................... 110
O
Operating conditions, calling up................................. 89
Operating data, calling up.......................................... 89
Operating program changeover............................... 118
Outlet temperature sensor....................................... 105
Outside temperature sensor.....................................101
P
Plate heat exchanger............................................... 105
Protective anode
– Anode, checking......................................................55
– Anode, replacing..................................................... 55
– Checking the anode connection..............................53
– Testing the anode current........................................53
R
Raising reduced room temperature..........................121
Reduced set room temperature................................. 65
Reducing heat-up output..........................................121
Reducing heat-up time............................................. 122
Relay test................................................................... 91
Remote control.........................................................123
Keyword index
Keyword index
5773 238 GB
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...