51
A
B
C
Fig. 42
Flue gas cascade:
Clean the trap in the flue gas header as well.
1.
Check at the siphon that the condensate can drain
freely.
2.
Remove retaining clip
A
.
3.
Pull filler pipe
B
upwards.
4.
Remove trap
C
downwards.
5.
Remove the condensate hose from trap
C
.
6.
Clean the siphon.
7.
Fill siphon with water and reassemble with retaining
clip
A
.
8.
Check that the condensate pipe is connected cor-
rectly to the siphon and heat exchanger.
Note
Route the drain hose without any bends and with a
constant fall.
Commissioning, inspection, maintenance
Checking the condensate drain and cleaning the siphon
5773 238 GB
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...