Heating circuit
Rotary selector S1
setting
Heating circuit with mixer M2
(heating circuit 2)
2
2 3
4
5
6
1
0
9
8
7
Heating circuit with mixer M3
(heating circuit 3)
4
4
2 3
5
6
1
0
9
8
7
Checking the rotational direction of the mixer
motor
After being switched on, the boiler implements a self-
test. During this, the mixer is opened and closed again.
Note
The mixer motor can also be started via the actuator
test (see chapter "Checking outputs").
Observe the rotational direction of the mixer motor dur-
ing its self-test.
Then manually set the mixer back to "Open".
The flow temperature sensor must now capture a
higher temperature. If the temperature drops, either
the motor is turning in the wrong direction or the mixer
insert is incorrectly fitted.
Mixer installation instructions
Changing the rotational direction of the mixer motor (if required)
gS
BU
|
~
Fig. 80
1.
Remove the upper casing cover of the extension
kit.
Danger
An electric shock can be life-threatening.
Before opening the boiler, disconnect it from
the mains voltage, e.g. at the fuse or mains
isolator.
2.
At plug
gS
, swap the cores at terminals "
|
" and
"
~
".
3.
Refit the casing cover.
Check flow temperature sensor
10
1
10
30
50
70
90
110
Temperature in °C
0.4
0.6
0.8
2
4
6
8
20
Resistance
in kΩ
Fig. 81
Sensor type: NTC 10 k
Ω
1.
Disconnect plug
?
(flow temperature sensor).
2.
Check the sensor resistance and compare it to the
curve.
In the event of severe deviation replace the sensor.
Troubleshooting
Maintenance
(cont.)
5773 238 GB
Diagnosis
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...