148
Settings and test values
Set value
Commissioning Maintenance/
service
Date
Signature
Static pressure
mbar
kPa
≤
57.5
≤
5.75
Supply pressure (flow pressure)
=
for natural gas E
mbar
kPa
17-25
1.70-2.5
=
for natural gas LL
mbar
kPa
17-25
1.70-2.5
=
for LPG
mbar
kPa
42.5-57.5
4.25-5.75
Tick gas type
Carbon dioxide content CO
2
For natural gas
■
At lower heating output
% by vol.
7.5-9.5
■
At upper heating output
% by vol.
7.5-9.5
For LPG
■
At lower heating output
% by vol.
8.8-11.1
■
At upper heating output
% by vol.
8.8-11.1
Oxygen content O
2
■
At lower heating output
% by vol.
4.0-7.6
■
At upper heating output
% by vol.
4.0-7.6
Carbon monoxide content CO
■
At lower heating output
ppm
< 1000
■
At upper heating output
ppm
< 1000
Commissioning/service reports
Commissioning/service reports
5773 238 GB
Appendix
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...