70
Coding
Coding in the delivered condition
Possible change
Burner service in 100 hours
21:0
No service interval set (in hours
run)
21:1
to
21:100
The number of hours run before the
burner should be serviced is adjust-
able from 100 to 10 000 h.
One adjusting step
≙
100 h
Service interval in months
23:0
No time set for burner service in-
terval
23:1
to
23:24
Interval adjustable from 1 to
24 months
Service status
24:0
No
"Service"
indication on the dis-
play
24:1
"Service"
is shown on the display
(address is automatically set and
must be manually reset after a serv-
ice has been carried out)
Filling/venting
2F:0
Venting program/fill program inac-
tive
2F:1
Venting program active
2F:2
Fill program active
"DHW"
Select group
"DHW"
(see page 68).
Coding
Coding in the delivered condition
Possible change
Set DHW temperature reheating suppression
67:40
For solar DHW heating: Set DHW
temperature 40 °C. Above the se-
lected set temperature, DHW re-
heating suppression is active
(DHW heating by the boiler only if
solar energy is insufficient).
67:0
to
67:95
Set DHW temperature adjustable
from 0 to 95 °C (limited by boiler-
specific parameters)
Observe setting for coding address
"56".
Enable DHW circulation pump
73:0
DHW circulation pump: "ON" ac-
cording to time program
73:1
to
73:6
During time program
"ON" from once per hour for 5 min to
"ON" 6 times per hour for 5 min
73:7
Constantly "ON"
"Solar"
Select group
"Solar"
(see page 68).
Code 1
"Boiler"
(cont.)
5773 238 GB
Codes
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...