68
■
On weather-compensated control units, codes are
displayed as plain text.
■
Codes that are not assigned, due to the heating sys-
tem equipment level or the setting of other codes,
are not displayed.
■
Heating systems with one heating circuit without
mixer and one or two heating circuits with mixer:
Below, the heating circuit without mixer is designated
"Heating circuit 1"
and the heating circuits with
mixer as
"Heating circuit 2"
or
"Heating circuit 3"
.
If the heating circuits were given individual designa-
tions, the selected designation and
"HC1"
,
"HC2"
or
"HC3"
appear instead.
The codes are divided into groups
■
"General"
■
"Boiler"
■
"DHW"
■
"Solar"
■
"Heating circuit 1/2/3"
■
"All codes std device"
In this group, all coding addresses from coding
level 1 (except the coding addresses of the
"Solar"
group) are displayed in ascending order.
■
"Standard setting"
Calling up code 1
Service menu:
1. Press
OK
and
å
simultaneously for approx. 4 s.
2.
"Coding level 1"
3. Select group of required coding address.
4. Select coding address.
5. Set the value according to the following tables and
confirm with
OK
.
Resetting all codes to the factory setting
Select
"Standard setting"
.
Note
This also resets codes at coding level 2.
"General"
Select group
"General"
Coding
Coding in the delivered condition
Possible change
System design
00:2
One heating circuit without mixer
A1 (heating circuit 1)
00:4
to
00:10
For system schemes, see the follow-
ing table:
Value, ad-
dress 00: ...
Description
2
One heating circuit without mixer A1 (heating circuit 1) (code is set automatically)
4
One heating circuit with mixer M2 (heating circuit 2)
6
One heating circuit without mixer A1 (heating circuit 1)
One heating circuit with mixer M2 (heating circuit 2)
(code is set automatically)
Code 1
(cont.)
5773 238 GB
Codes
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...