74
Coding in the delivered condition
Possible change
Screed drying
F1:0
Screed drying not active.
F1:1
to
F1:6
Only for heating circuit with mixer:
Screed drying adjustable, with
choice of 6 temperature/time profiles
(see page 119)
F1:15
Constant flow temperature 20 °C
Party mode time limit
F2:8
Time limit for party mode or exter-
nal operating program changeover
via button: 8 h
*1
Note
Observe settings for coding ad-
dresses "3A", "3b" and "3C" in
group
"General"
, as well as "d5"
and "d8" in group
"Heating cir-
cuit..."
.
F2:0
No time limit.
*1
F2:1
to
F2:12
Time limit adjustable from 1 to 12 h
*1
Start temperature raising
F8:–5
Temperature limit for terminating
reduced mode
–
5 °C, see example
on page 121.
Observe setting for coding address
"A3".
F8:+10
to
F8:–60
Temperature limit adjustable from
+10 to
–
60 °C
F8:–61
Function not active
End temperature raising
F9:–14
Temperature limit for raising the re-
duced set room temperature
–
14 °C, see example on
page 121.
F9:+10
to
F9:–60
Temperature limit for raising the set
room temperature to the value se-
lected for standard mode adjustable
from
+10 to
–
60 °C
Set flow temperature increase
FA:20
Raising of the set boiler water or
flow temperature by 20 % when
changing from operation with re-
duced room temperature to opera-
tion with standard room tempera-
ture. See example on page 122.
FA:0
to
FA:50
Temperature rise adjustable from 0
to 50 %
Duration set flow temperature increase
Fb:60
Duration for raising the set boiler
water temperature or set flow tem-
perature (see coding address "FA")
60 min. See example on
page 122.
Fb:0
to
Fb:300
Time period adjustable from 0 to
300 min.
*1
In the "Heating and DHW" program, party mode ends
automatically
when the system changes over to operation with
standard room temperature.
Code 1
"Heating circuit ..."
(cont.)
5773 238 GB
Codes
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...